The A-Z of Architecture Argot

The A-Z of Architecture Argot

Working with your Architectural project team on a new home, house extension, or development project is always an exciting adventure, however, the hundreds of technical architectural terms we use can be confusing.

Whilst Architectural words and phrases form part of our daily discussions, for someone new to our world it can indeed sound like a foreign language.

To help you better understand this dialect of industry acronyms and colloquialisms we have put together a list of the most common phrases you might hear being used by our Architect team when planning your next building project.

Happy reading!

A

ACO Drain – A drainage system that collects water from the surface of a pavement and directs it into an underground drain.

Aesthetic – The appearance of something.

Arcade – A covered walkway lined by columns.

Archway – An opening with a curved or pointed top.

Asbestos Survey – A survey undertaken on a property to identify if asbestos-containing materials are present.

Architectural Symmetry – Characteristic by which the two sides of a facade or architectural floor plan of a building present mirror images of one another.

B

Balcony – A platform that projects from the wall of a building.

Balustrade – A guard to protect from falling or to assist with walking.

Banal – The architect’s version of “boring”.

Bespoke – Individual and unique. This often applies to joinery, built-in carpentry, or kitchens.

Beam – A horizontal structural member usually in steel or timber which needs to be designed /sized, in most cases by a Structural Engineer

Bracket – A projection from a vertical surface that provides structural and/or visual support for overhanging elements.

Building Envelope – The elements that wrap a building – the outside of the total building.

Build Over Agreement – Compliance for when your extension or conversion takes place near or over a public sewer to confirm the foundations of your new construction have given sufficient clearance from the sewer and that access will still be possible if the need arises. An application to the water authority will need to be made and a fee paid.

C

Cantilever – A long projecting element fixed at only one end, with no columns to support it.

Casement Window – A window frame that is hinged on one vertical side or at the top, and which swings open to either the inside or the outside of the building.

Cashflow Forecast – A chart to show how the total cost of the project will be spread over the whole programme of the building works.

Column – A vertical structural member or pillar usually in steel or timber to support a horizontal structural member.

Conservation Area – An area of a town or village designated by the local authority as needing to be managed and protected due to the special architectural and historic interest of the place.

Contamination Report – A Phase 1 report by a specialist is often needed to accompany a planning application when a barn conversion or new home is proposed to check if any previous use on that land would cause a risk to future residents of a dwelling or other new use. If contamination is predicted then a Phase 2 report will be required, complete with soil and other tests if asked for in the planning conditions, followed by a Remediation Report and finally at the end of the build by a Verification Report.

Contemporary – Current and up to date design.

D

Dimension – The length or height of something.

Domesticity – A description of a place’s homeliness.

Dormer Window – A perpendicular window located in a sloping roof to provide more space, height, and light.

E

Eaves – The projecting edge of a roof that overhangs an exterior wall or opening and supports the gutter (unless there is a concealed gutter).

Elevation – The view when looked at the face on to each side of the building

Extension – The construction of extra floor space for an existing building.

F

Facade – An exterior wall, or face, of a building.

Fascia – A sheet of material timber, plywood, or sometimes UPVC at the eaves and behind the gutter.

Fenestration – The arrangement of windows and external doors.

First Fix – the first stage of fitting in a building project, for example, fitting the wires for the sockets or the pipework to the future radiators or sanitary ware

Floor Plan – The arrangement of rooms in a building at each level.

Floor Area – The total area measured as square metres taken up by a building on each floor, usually taken from within the exterior walls

Foundations / Footings – Designed by a structural engineer to sit under the building to evenly transfer the weight of the building to the earth, most often in concrete.

G

Gentrification – Standardising, normalising and bring wealth into a place.

I

Ironmongery – Items made from iron such as door handles,  locks, hinges window fittings, railings, handrails, switches, and sockets.

J

Joinery – Carpentry.

Joists – A horizontal structural element that supports the floor and/or ceiling

Juxtaposition – Two opposites placed together for increased effect (old and new).

L

Listed Building – A listed building or structure is one that has been placed on a statutory list by Historic England and requires protection not to be demolished, extended, or altered without special permission from the Local Planning Authority.

Listed Building Consent – Permission is given when a Listed Building Application has been made and approval has been given.

Loft Conversion – The process of transforming an existing empty attic space or loft into a functional room.

M

Masonry – Being of stone, brick, or concrete.

Massing – A simple arrangement of the to-be designed spaces.

Modular – Describes a (simple) construction system for a building that could be added to indefinitely.

N

Nodes – The connecting point of a network, usually of roads or paths.

O

Orangery – an extension, which has a solid structure with proportionately more brickwork than that of a conservatory with, a flat roof and a lantern and windows at the sides separated by columns that sit beneath the roof formed of internal pelmets and glass panels.

Organic – Natural and often curvy in appearance.

P

Parapet – Usually a piece of wall that protrudes up above a flat roof, for example, to hide a gutter when you build close to a boundary

Party Wall – A wall, also known as a common wall that is a dividing partition between two adjoining buildings that is shared by the occupants of each residence or business. If you need to cut steel beams into a party wall then a party wall agreement is required.

PEA – Preliminary Ecological Assessment – often required accompanying planning applications for barn conversions or new houses to assess if any protected species are living within the agricultural building or on the land.

Plan – An aerial view, looking down onto the building. They can show the roof, doors, walls, and windows, together with the internal layout.

Planning Permission – Permission is given to carry out certain building works or extensions issued by the Local Planning Authority after an application has been made following the issue of drawings and other related documents.

Planning Conditions – Each planning permission has attached to it certain conditions to be complied with some of these are pre-commencement planning conditions that need to be satisfied before construction can begin by means of extra drawings or reports to be issued with a further planning application for approval of conditions.

Programme – A chart to show which order building work will be carried out over a number of weeks.

Projection – A side wing, tower, or window bay that protrudes from a building.

Proud – Sticking out, as in “the countertop is proud of the cabinet” sits proud

Purlin – Longitudinal, horizontal structural member in a roof (often used in roofs which do not have trusses.)

R

Rafter – A sloped structural member such as a wooden beam that extends from the ridge, wall plate, or eave designed to support the roof deck.

Rebate – A recessed strip.

Regenerate – To improve and bring back to life.

Ridge – The horizontal line at the junction of the top edges of two sloping roof surfaces.

Ridge Beam – The top structural member of a roof either in steel or structural timber

Robust – An object, method, or idea that seems to be flawless and sensible.

Roofline – The top of the part of a building that rises above the eaves of the building.

Rooflight – A window in the slope of a roof or set in a flat roof with upstands.

S

Sanitary Ware – Toilets, basins, showers, shower trays, baths, taps, etc.

SAP Calculation – A rating that is required to produce a Predicted Energy Assessment and an On Construction Energy Performance Certificate.

Sash Window – A window usually made from timber, which has the opening parts sliding vertically (or horizontally) within a frame. Mostly works on a series of lead weights but more recently by a pair of spiral sash balances.

Scale – The size of something. Planning drawings are often at a scale of 1:100 and construction drawings are at a scale of 1:50 or 1:20 with joinery details at a larger scale of 1:10. 1:5 or 1:2.

Second Fix – The final process of fitting electrical or mechanical work at the end of a project – completing actual fittings such as sockets, taps, radiators, and sanitary ware.

Section – A drawing of a vertical cut through of the building that results in the removal of one of the selected parts to reveal it’s the object’s inner elements – used usually to show the space and structure of a building.

Sequence – A defined order of items.

Setback – A step-like recession in a wall.

Site Investigation – A preliminary process used to gather the information needed to carry out the viability of the project.

Soffit – The flat board in timber, ply, or UPVC under the eaves.

Spatial Composition – How a building and its parts sit together and interact with its context.

Sustainability – A measure of how environmentally friendly a building is.

T

Threshold – The boundary between two spaces, often marked by a door, change of flooring, or similar change.

Trial Hole – A pit or trench dug to determine the geology and the water table of the site. Structural engineers can need to commission these to be dug in the ground to analyse the make of the ground at different depths to be able to design the foundations of a building or extension. Particularly needed if there are trees in close proximity.

Topographical Survey – Az survey by a company of existing buildings and land to measure what exists and work out ground levels.

Trusses – A triangular roof structure usually made of wood that actually makes up the roof structure.

U

U Value – The measure of how effective the building’s fabric areas are at preventing heat from transmitting between the inside and the outside of a building.

V

Vernacular Architecture – Vernacular architecture responds to local methods of building construction, local climates, and local living needs and traditions.

Our talented Architects offer exciting ideas and expert opinions on layouts and plans for new homes, house extensions, conversions, home office, pool houses, and much more. Take advantage of our extensive local ‘planning permission’ and ‘permitted development’ knowledge and let our brilliant team turn your concept into a reality.


Author : Jessica Parkes. Read more articles for MP Architects LLP https://www.martynpattie.co.uk/news/

Furlough Fruition, Baking and Beyond….

March 2020 and the nation tuned in to listen to Chancellor, Rishi Sunak announce unprecedented measures supporting businesses and their employees through the COVID-19 pandemic.

For many of us, the term ‘Furlough’ was an unknown phrase and a new concept.  Fast forward a few months and Furlough has certainly become a widely used word that over 9 million UK workers can now fully understand.

Like others, part of our team was temporarily “furloughed” as we adjusted our workforce to meet staff and business needs. 

As tempting as it may sound, binge-watching Netflix in their PJ’s was something that none of our furloughed staff wanted to do.  They made the most of the opportunity to engage in training and learning new skills, so that upon their return to work they will be more prepared and informed than ever before! 

And they didn’t disappoint….

One of our Senior Architects, Kate Murray spent many hours educating and improving her knowledge of Revit, the leading BIM modelling software tool that is used by architects all over the world. Revit enables the design of structures that, when built, should look exactly like the digital view.  Kate also managed to decorate no less than five rooms in her home and perfected her baking skills of delicious sourdough ‘lockdown’ loaves!

Dandi Passerini is another multi-talented member of our team.  Along with learning the art of ‘parent home schooling’ Dandi also continued to fulfil her annual RIBA CPD obligations, whilst studying very hard to become a qualified BREEAM AP.  

BREEAM is the world’s leading sustainability assessment method for master planning projects, infrastructure, and buildings, which means that Dandi will be able to provide a professional BREEAM consultancy service to clients, designing buildings that achieve the accredited BREEAM sustainable rating.  

Our Architectural Assistant, Navid Hamzeheinejad has definitely made the most of this great opportunity too.  Navid has been working tirelessly on his studies for his RIBA Part 3 examinations. This is the final stage of the qualification process, that will see Navid’s passion and dream of becoming a qualified Architect develop into a reality.   And…as if that wasn’t enough to keep him busy, Navid has also given himself a huge skills boost, engaging in Rhino 3D design software tutorials and allocating any spare time to becoming a multilingual mastermind and taking steps to learn German. Gute Arbeit Navid!

Upon reflection, as businesses start to reopen and staff begin to return, the furlough scheme has allowed us to adapt to the challenges that came hand in hand with pandemic and the global economic slowdown, but it has also lent itself to allowing our passionate team to up-skill and educate themselves, making ‘furlough’ work for their careers, our customers and to support the longevity of our successful Architect Practice.

Stay Healthy.

Martyn Pattie


Author : Jessica Parkes. Read more articles for MP Architects LLP https://www.martynpattie.co.uk/news/

Thank you NHS Key Workers

We want to say a huge thank you to the thousands of key workers that have been working tirelessly on the frontline during the COVID -19 pandemic. We are truly inspired by what you are all doing in these challenging times.

Despite the hardships and health risks, our essential frontline workers continue to do their jobs to keep us safe, fed, collecting our bins, providing life-saving medicine, caring for those who are most vulnerable, cleaning our public places and hospitals.

We thank you for the risks and challenges you face, putting your lives on the line, trying to save ours.  

We also extend our thanks to our loyal clients and future customers for supporting our local architectural practice at this difficult time.  We are continuing to work and moving your projects forward, but also protecting each other by observing Public Health England’s social distancing guidelines. 

 Please Stay Safe and Protect our NHS.

Thank you NHS rainbow


Author : Jessica Parkes. Read more articles for MP Architects LLP https://www.martynpattie.co.uk/news/

Your Future Way of Living

As the COVID-19 pandemic continues to own the world, the Government message remains crystal clear. Stay at Home. 

Could the perfect medicine to pass the time in isolation be re-evaluating your future life and property plans?

It is true that the COVID-19 lockdown has brought the property sales market to a standstill and that our economy will be affected.  

However, once we get past this ‘history-making’ blip, experts say that there could be an economic boom.  People will have re-evaluated life and living and start to spend money on the things that they now deem are most important to themselves and their families.

Has being forced to ‘work from home’ actually been a real success? Whilst earning your livelihood from the kitchen table has been ok for now, if it is to be part of a longer-term solution to your work/life balance, you could be considering building a beautiful new home office.

The imposed downtime may have finally enabled you to spend some quality time, searching online for that perfect plot of land to build your dream new home or even a development project. Is now the time to make it happen?

Or have you realised that for more harmonious living, your growing teenagers need their own space away from the family fold and the answer is building an exercise studio, music room or even a stylish annex?

COVID-19 has changed our outlook dramatically.  Apart from anything else it has given us time to rethink and consider what matters most and how we will all live our lives going forward.

If you have future property plans and would like some professional advice on how to achieve them our fantastic team at MP Architects are here and ready to support you. 

Our talented Architects offer exciting ideas and expert opinions on layouts and plans.  You can take advantage of their extensive local ‘planning permission’ knowledge and let their brilliant drawings turn your concept into a reality.

There is no need for ‘face to face’ meetings or handshakes, we are working just as effectively through contactless telephone consultations and our easy to use virtual meeting resources.  

Please contact us at any time via email or telephone to discuss putting the plans in place for your future way of living.

We look forward to hearing from you.

Stay healthy.


Author : Jessica Parkes. Read more articles for MP Architects LLP https://www.martynpattie.co.uk/news/